Cavity Tray Type X Long Lead - LH Catchment 23.5°
Product code: FHR36900
Cavitray for gable abutments. It has upstands to both ends; receives water from the intermediate trays and discharges through a Caviweep supplied with the tray.
Product description
Made from preformed DPC with an attached ready-shaped flashing. When laid in every course of a cavity wall external skin and against which a sloping roof abuts, Type X trays provide continuous stepped DPC protection running parallel with the slope. Any water and dampness in the exposed masonry skin above this stepped arrangement is prevented from gravitating in a downwards direction below it. Therefore, the masonry skin is wet above the roofline but remains dry where it becomes an internal wall. Trays come handed and, as you view the gable, the left hand trays discharge to the left and the right-hand trays discharge to the right.
Product details
Tray Size
270mm
Flashing Size
225mm - 330mm*Varies depending on pitch
Angle (degrees)
23.5
Manufacturer Brand Name
Cavity Trays Ltd
Key features
- Adjusts to cavity width – ensures correct relationship
- Integral anticapil features and integrity strip
- Traditional or timber frame compatible
- Clear cavity compartment area – unobstructed flow
- Attached shaped flashing secured in bosem jaw
- Integral alignment guide
- Gusset prevents inboard water discharge